Highway 65 Widening – Project Documents
Final Environmental and Project Approval Documents
Notice of Determination – Caltrans / PCTPA – March 2018
NOD.PDFFinal Initial Study with Mitigated Negative Declaration (IS/MND) – Caltrans / PCTPA – November 2017 [36 MB]
FinalISMND.pdfFinal Categorical Exclusion (CE) – Caltrans / PCTPA – March 2018
FinalCE.pdfFinal Project Report – Caltrans/PCTPA – March 2018
FinalPR.pdf
Initial Study With Proposed Mitigated Negative Declaration
Initial Study With Proposed Mitigated Negative Declaration (IS/MND) – Caltrans / PCTPA – May 2017
draftismnd.pdf
Draft Project Report
Draft Project Report – Caltrans/PCTPA – February 2017
draftpr.pdfAttachment A – Geometric Approval Drawings
attachmenta.pdfAttachment B – Transportation Analysis Report
attachmentb.pdfAttachment C – Phase 1 Traffic Analysis Memorandum
attachmentc.pdfAttachment D – Advanced Planning Studies
attachmentd.pdfAttachment E – Draft Right-of-Way Data Sheets
attachmente.pdfAttachment F – Draft Storm Water Data Report
attachmentf.pdfAttachment G – Preliminary Cost Estimate
attachmentg.pdfAttachment H – Draft Exceptions to Design Standards
attachmenth.pdfAttachment I – Initial Site Assessment and Aerially Deposited Lead Assessment
attachmenti.pdfAttachment J – Draft Environmental Document
attachmentj.pdfAttachment K – Transportation Management Plan Checklist and Data Sheet
attachmentk.pdfAttachment L – Draft Landscape Architecture Assessment Sheet
attachmentl.pdfAttachment M – Risk Register
attachmentm.pdf
Draft IS/MND and Draft Project Report Supporting Technical Studies
Aerially Deposited Lead Assessment – Blackburn Consulting – 2015
depositedlead.pdfAir Quality Conformity Analysis – ICF International – 2016
airqualityconformity.pdfAir Quality Study Report – ICF International – 2016
airquality.pdfCommunity Impacts Technical Memorandum – ICF International – 2016
communityimpact.pdfHistoric Property Survey Report – ICF International – 2016
historicproperty.pdfInitial Site Assessment – Blackburn Consulting – 2014
initialsite.pdfNatural Environment Study – ICF International – 2017
naturalenvironment.pdfNoise Study Report – ICF International – 2016
noise.pdfPreliminary Drainage Analysis – Mark Thomas & Company – 2016
drainage.pdfStorm Water Data Report – Mark Thomas & Company – 2016
stormwater.pdfStructure Preliminary Geotechnical Report – Blackburn Consulting – 2015
structuregeotechnical.pdfTransportation Analysis Report – Fehr & Peers – 2015
transportation.pdfVisual Impact Assessment – ICF International – 2016
visual.pdfWater Quality Assessment Report – ICF International – 2017
waterquality.pdfOther Project Documents
Project Study Report – Project Development Support (Caltrans)
SR65_PA&ED_RFP_PSR-PDS.pdfProject Highlight Page
PCTPA_Newsletter25_65 Widening_5.2014.pdfPCTPA Board Presentation (Auburn, CA) – May 14, 2014
SR65ConceptsPresentation_5-14-14.pdfCommunity Workshop #1 Presentation (Lincoln, CA) – July 24, 2014
SR65_Widening_PublicWorkshop_07-24-14.pdfCommunity Workshop #1 Summary (Lincoln, CA) – July 24, 2014
SR65_Widening_PublicWorkshop_07-24-14_Summary.pdf